This orchard drainage project required compact power that could work between established tree rows without damaging roots or packing soft ground.
The buyer selected the CYD-18 platform for dig depth, rubber-track flotation, and easy transport between blocks. Pre-shipment spare kits helped the farm maintain filters and teeth during peak season.
Results were measured in completed trench meters per day and reduced hired labor during the drainage window.